Nobody can be in the kitchen at the same time
A galley or closed-off kitchen is the most common reason people extend. Usually it means a single-storey rear extension that turns the kitchen and dining room into one space facing the garden.

When the kitchen is a squeeze and the dining table is also the desk and the homework station, more space changes how the whole house works. SG Build has been extending homes in Crawley and the villages around it since 1999: rear extensions, side-return extensions and the open kitchen-diners most families want.
Tell Sean what you have in mind. A rough idea is enough.
Tell Sean what you have in mind. A rough idea is enough.
We’re a family-run team of six, and we dig our own groundworks. The footings, the drainage and the groundworks are dug by the same people who build the walls, so nothing gets lost between trades. See finished jobs on our work page, or read on for how an extension goes, start to finish.
01 / Where it starts
These are the problems people ring us about most, and the kind of extension each one usually leads to.
A galley or closed-off kitchen is the most common reason people extend. Usually it means a single-storey rear extension that turns the kitchen and dining room into one space facing the garden.
When one room does three jobs, the answer is often to move the kitchen into new space at the back and give the old kitchen a second life as a study, utility or snug.
That alley by the bins is often the most useful ground you own. A side-return extension can widen the whole back of the house and let light in from above with rooflights.
Moving costs stamp duty, fees and the neighbours you like. Extending keeps the postcode and the school run, and adds space where you spend your day.

02 / The options
A rear extension pushes the back of the house into the garden. It’s the usual choice for a bigger kitchen-diner or a family room, and it rarely takes much garden: three or four metres of depth changes how the whole ground floor feels.
A side-return extension fills the strip of land beside the house. On many semis and terraces that strip is wasted on bins and a path. Built over, it widens the kitchen and, with glazing in the roof, brings light into the middle of the house.
A wrap-around extension combines the two in an L shape. It gives the most space, and it’s also the biggest job, with more structure, more roof and usually more conversation with the council.
03 / Who does the work
One team, from the first dig to the last coat of paint.
An extension is only as good as what it stands on. The footings have to suit the soil, the drains often need moving, and the new floor has to meet the old one at the right level. When the groundworker and the builder are different firms, those joins are where problems start.
At SG Build the same team digs the footings, lays the drainage, builds the walls and finishes inside. Sean runs the job from the first dig to the final clean, so there’s one person to ask and one person responsible.

04 / How it works
Sean comes to the house, looks at the back and side, the access and the drains, and listens to how you want to use the space.
You’ll need drawings and Building Regulations approval, and sometimes planning permission or a Party Wall notice. We talk through which apply to your house before anything is priced.
A clear written quote based on the drawings and what we saw on site, so you know what’s included and what isn’t.
Footings dug to suit the ground, drainage moved or renewed, and the slab laid level with the existing floor.
Walls up, roof on, windows and doors in, so the building is watertight before the old wall comes out.
The opening is made into the house with the steel the engineer specifies, then plastering, flooring and the finishing work.
05 / Reviews from our clients
Sean & his team were extremely hard working, a delight to work with, honest & reliable. We are very pleased with the standard of work & the way Sean managed the entire project, nothing was too much trouble. We have no hesitation in recommending them to anyone.
From day one Sean and the team took away all the stress and anxiety that had been building alongside the excitement and prospect undertaking our long awaited extension. The whole build ran like clockwork. Sean and his team were all really professional and lovely to work with. We cannot thank you enough for everything you've done for us.
Got a rough idea of the size? That is enough to start the conversation.
06 / Worth knowing before you build
Much of Crawley and the villages around it sit on Weald clay. Clay swells when it is wet and shrinks when it dries, and that movement is the reason some extensions crack away from the house a few summers after they are finished.
Trees and big hedges near where the extension will go, an older extension that has already cracked where it meets the house, and gardens that crack open in a dry summer are all signs the ground moves.
A shallow footing on shrinkable clay near a tree is what fails. Building Regulations and the building inspector will set the depth, and near trees it can need to go much deeper than people expect.
Because we dig our own groundworks, we see the ground before the walls go up. If the soil or a nearby tree needs deeper footings, you hear about it then, with the building inspector, not after the extension has moved.
07 / Cost
Two extensions of the same size can cost very different amounts. These are the things that move the price most:
Use the planner below for a rough single-storey figure, then ask for a written quote after a visit. The planner is a guide only.
Extension footprint
External dimensions only, priced at a typical mid-spec rate. Ground conditions, finish and the existing layout can move this a lot either way.
Get a free quote


08 / Before work starts
Many single-storey rear extensions fall under permitted development and do not need a planning application. As a general guide that means up to 3 metres deep on a semi or terrace and 4 metres on a detached house, no more than 4 metres high, and lower near a boundary. Flats, listed buildings and conservation areas have different rules, so always check with the council or the Planning Portal first.
Almost every extension needs Building Regulations approval, whether or not it needs planning. The building inspector checks the footings, drainage, structure and insulation as the work goes on.
If you build on or near the boundary with a neighbour, or dig foundations close to their house, the Party Wall Act usually means serving them notice before work starts. It’s far easier to sort out at the start than halfway through.
09 / Where we build
Most of our extension work is within a few miles of Crawley. Each area has its own kind of house, and that shapes the extension.
The older new-town neighbourhoods have plenty of semis and terraces with gardens long enough for a proper rear extension. One West Green family wrote that their long-awaited extension "ran like clockwork".
Newer estate homes often have smaller kitchens and garages that are rarely used for a car. A rear kitchen-diner is the usual request here, and Maidenbower is where Mrs Gee had Sean manage her whole project.
Close to where SG Build is based. Side returns, kitchen extensions and the groundworks that go with them, including new drainage where the old runs sit in the way.
Village and edge-of-town houses often come with bigger plots, mature trees and more room to build, which makes the ground and the footings even more important to get right.
10 / Questions
It depends on the size, the ground, access and the finish. The planner on this page gives a rough single-storey range; for a real figure, ask for a visit and a written quote.
Often not, if it fits within permitted development, but it depends on the house and where it is. Check with the council or the Planning Portal before you commit.
Almost always, yes. The building inspector checks the work in stages, including the footings and drainage that we dig.
Usually, yes. The new shell is built and made watertight before the wall into the house is opened, which keeps the disruption to a shorter stretch at the end.
Yes. Footings, drainage and the slab are done by our own team, the same people who build the extension.
If you build on or near the boundary, or dig close to a neighbour’s house, you usually need to serve notice under the Party Wall Act before work starts.
Drawings if you have them, photos of the back and side of the house, your postcode and an idea of the finish. If you don’t have drawings yet, tell us what you want the space for.
Often, yes. Access for materials is the main thing to plan on terraces with no side way, and the neighbours’ boundary matters too.
Crawley and the villages around it make up most of our work, including Horsham, Copthorne, Rusper and Faygate. Ask if you are a little further out.
Free advice. A written quote. A place to start.
Say where you are, what you have in mind and whether you have drawings. An early idea is a good enough starting point.
07906 809589 info@sgbuild.co.uk